Gestra, Rotork, Daniel, Georg Ficher, Agar, Sofis, Pump, Valves

Projects

Main Piping Material for Chlorine System Project

We provided piping & fitting for Main Piping Material for Chlorine System Project at Song Hau 1 Power Plant, included:

  • Piping: carbon steel, PVC-C material
  • Fitting (elbow, reducer, tee, coubling, union, nipple,...): carbon steel, PVC-C material
  • Stud & bolts: carbon steel
  • Gasket: FKM, EPDM material
  • Brands of goods: Goerge Fischer, Spear, Engineering EDGE, PURA

 

Gestra, Rotork, Daniel, Georg Ficher, Agar, Sofis, Pump, Valves